Maintenance: Meter-Based Plannings

Written by Jessica Franco

The Maintenance module allows you to automate preventive maintenance for your assets by generating tasks when a meter reaches predefined milestones instead of using fixed calendar dates.

For example, you can schedule maintenance every 250 operating hours, every 10,000 km (or miles), or based on any other meter associated with an asset.

Important: Maintenance is built on top of the Planning module. If you're not familiar with how it works, we recommend reading the Task Plannings in DataScope article first.


How does it work?

A maintenance planning uses an asset's meter readings to estimate when predefined milestones will be reached and automatically generates the corresponding maintenance tasks.

The process consists of six steps:

  1. Create a maintenance template.

  2. Configure the planning for an asset.

  3. Define how milestones will be projected.

  4. Configure the prediction engine.

  5. Create the tasks for each maintenance level.

  6. Activate the planning.


1. Create a maintenance template

Go to Planning Templates, then create a new template or edit an existing one.

Under Cycle Configuration, select Meter (Asset Required) instead of Time-Based.

With this type of template, selecting an asset is always required when creating a planning.

Select the meter

Choose the meter that will be used by the planning, for example:

  • Hour Meter

  • Mileage

  • Cycle Counter

Configure the maintenance strategy

The maintenance strategy defines the milestones at which tasks will be generated.

For example:

Level

Frequency

PM1

Every 250 hours

PM2

Every 500 hours

PM3

Every 1,000 hours

PM4

Every 2,000 hours

The preview lets you visualize the order and frequency of each maintenance milestone.


2. Configure the execution window

The execution window determines when a task will be created and how long it will remain available to be completed.

Configure:

Planning start, which can be:

  • On the projected date

  • 1 day before

  • 3 days before

  • 1 week before

  • 15 days before

Task availability duration.

Example

If you configure:

  • Planning start: 3 days before

  • Duration: 3 days

The task will remain available for a total of 6 days:

  • It will be assigned 3 days before the projected date.

  • It will remain available until 3 days after the projected date.

This buffer is recommended because maintenance dates are projections and may change based on the asset's actual usage.


3. Define the tasks for each level

Each maintenance level can include one or more forms.

For example:

  • PM1 → Basic inspection

  • PM2 → Oil change

  • PM3 → Complete inspection

Carry tasks across levels

You can enable Carry Tasks Across Levels.

When enabled, the forms configured for one maintenance level are automatically inherited by higher levels.

For example:

  • PM1 includes a basic inspection.

  • PM2 includes an oil change.

If both milestones occur at the same time, PM2 can also include the PM1 inspection.

This ensures that maintenance activities from lower levels are not skipped when a higher-level maintenance takes priority.

Inherited forms can always be removed manually if needed.


4. Create the planning

Once the template has been created, create a new maintenance planning.

Select:

  • The previously created Maintenance Template

  • Planning name

  • Supervisor

  • Asset

Only assets with a configured meter will be available.

The Location field is automatically populated using the selected asset.


5. Configure the prediction engine

The prediction engine estimates when the asset will reach each maintenance milestone.

There are two available methods.

  • Automatic calculation

Uses the asset's historical meter readings to calculate an average usage rate.

For example:

  • Current reading: 160 hours

  • Average usage: 5 hours per day

Based on this information, DataScope projects when the asset will reach 250 hours, 500 hours, and the remaining milestones.

You can also define how many months of historical data should be used for the calculation (Calculation Range). For example, if you choose the last six months, DataScope calculates the average usage rate using only the readings recorded during that period. If the asset doesn't have that much historical data, all available readings are used.

  • Manual average

If there isn't enough historical data yet, you can manually enter an estimated daily usage.

For example:

  • 8 hours per day

Projected dates will automatically adjust as new meter readings are recorded.


6. Create the tasks and activate the planning

Before activating the planning, you must create the task associated with each maintenance level.

Each task can be assigned to:

  • An individual user.

  • A user group.

Once every maintenance level has an assigned task, the Create and Activate Planning button becomes available.


Monitoring the planning

After activation, the planning displays information such as:

  • Next milestone

  • Current meter reading

  • Projected date

  • Calculated usage rate

  • Responsible user

  • Associated asset

You'll also find a timeline showing all projected maintenance milestones and a table summarizing:

  • Maintenance type

  • Target reading

  • Projected date

  • Associated tasks

  • Participants

  • Status


When are tasks actually created?

The maintenance milestones shown in the projection are not actual tasks. They are estimates based on the predicted usage of the asset.

This information is updated every time someone opens the Maintenance module. At that moment, DataScope recalculates the projections using the most recent meter readings. For example, if the equipment was used earlier that day, that reading will already be reflected the next time the module is opened.

Even if nobody opens the module, DataScope performs an automatic update once a day to keep the projections up to date.

When that update determines that a maintenance milestone has entered its execution window, the corresponding task is automatically created and behaves like any other task in the system:

  • It is assigned to the corresponding user or group.

  • Configured notifications are sent.

  • Available integrations, such as Google Sheets, are triggered.

  • The task becomes available for completion.


Example

A company manages a fleet of trucks and performs preventive maintenance every 10,000 km, with a major service every 50,000 km.

To automate this process, they create a maintenance template using the Mileage meter and define milestones at:

  • 10,000 km

  • 20,000 km

  • 30,000 km

  • 40,000 km

  • 50,000 km

As each truck approaches one of these milestones, DataScope estimates when it will be reached. Once the milestone enters the configured execution window, the corresponding maintenance task is automatically created and assigned to the designated mechanic or responsible user.

The same workflow can be used for equipment with hour meters, industrial machinery with cycle counters, or any other asset that uses meters.


Considerations

  • An asset must have at least one configured meter; otherwise, it cannot be used in a maintenance planning.

  • Automatic calculation provides the best results when sufficient historical meter readings are available. If the history is limited, using a manual average is recommended until more data is collected.

  • A task must be created for every maintenance level before the planning can be activated.

  • Projected dates are estimates and may change as new meter readings are recorded.